Project References:
Federal:
U.S. Army Corps of Engineers, Omaha District - Spillway Chute and Stilling Basin Concrete, Joint and Subdrain Repairs; Contract No. W9128F-14-C-0014 (KCC Job #439)
Description:
Project consisted of hydro-demolition operations, concrete placement, joint repairs, sub-drain repairs and testing at the Garrison Dam in McLean and Mercer Counties, North Dakota.
Associated Trades:
Concrete, Hydro-Demolition Operations, Joint Sealing and Steel
Contract Amount:
$3,601,835.00
Completion Time:
9 Months (Completed August 2015)
Owner:
U.S. Army Corps of Engineers, Omaha District
1616 Capitol Avenue
Omaha, NE 68102-4901
Project Manager:
Wayne Gardner
Description:
Project consisted of hydro-demolition operations, concrete placement, joint repairs, sub-drain repairs and testing at the Garrison Dam in McLean and Mercer Counties, North Dakota.
Associated Trades:
Concrete, Hydro-Demolition Operations, Joint Sealing and Steel
Contract Amount:
$3,601,835.00
Completion Time:
9 Months (Completed August 2015)
Owner:
U.S. Army Corps of Engineers, Omaha District
1616 Capitol Avenue
Omaha, NE 68102-4901
Project Manager:
Wayne Gardner
Federal Highway Administration, Eastern Federal Lands Highway Division- Seney National Wildlife Refuge Bridge Replacement; Contract No. DTFH71-14-C-00025 (KCC Job #441)
Description:
Project consisted of the replacement of the J to H Spillway Bridge on Fishing Access Road within the Seney National Wildlife Refuge located in the Upper Peninsula, Michigan. The work included the removal of the existing one-lane, ten-span timber bridge with abutments and piers and the new construction of a one-lane, three-span concrete box girder bridge, reconstruction of the aggregate roadway and other miscellaneous items of work.
Associated Trades:
Concrete, Demolition, Earthwork / Excavation, Restoration, Site Dewatering, Steel and Traffic Control and Protection
Contract Amount:
$1,180,317.00
Completion Time:
8 Months (Completed March 2015)
Owner:
Federal Highway Administration
Eastern Federal Lands Highway Division
21400 Ridgetop Circle
Sterling, VA 20166-6511
Project Manager:
Rod Kovilic
Description:
Project consisted of the replacement of the J to H Spillway Bridge on Fishing Access Road within the Seney National Wildlife Refuge located in the Upper Peninsula, Michigan. The work included the removal of the existing one-lane, ten-span timber bridge with abutments and piers and the new construction of a one-lane, three-span concrete box girder bridge, reconstruction of the aggregate roadway and other miscellaneous items of work.
Associated Trades:
Concrete, Demolition, Earthwork / Excavation, Restoration, Site Dewatering, Steel and Traffic Control and Protection
Contract Amount:
$1,180,317.00
Completion Time:
8 Months (Completed March 2015)
Owner:
Federal Highway Administration
Eastern Federal Lands Highway Division
21400 Ridgetop Circle
Sterling, VA 20166-6511
Project Manager:
Rod Kovilic
Pictured Above: Various Phases, J to H Spillway Bridge Replacement; Seney National Wildlife Refuge (KCC Job #441)
U.S. Fish and Wildlife Service - Rehabilitation of Historic Duvall Bridge; Contract No. F12PS00205 (KCC Job #414)
Description:
Project consisted of the complete rehabilitation of the historic Duvall Bridge within the Patuxent Research Refuge in Laurel, Maryland. Specific work tasks included the replacement of elastomeric bearings and structural steel members, the application of a high-performance, anti-corrosion bridge coating and the removal and replacement of treated wood decking.
Associated Trades:
Carpentry, Concrete, Painting and Steel
Contract Amount:
$493,530.00
Completion Time:
3 Months (Completed December 2013)
Owner:
U.S. Fish and Wildlife Service
300 Westgate Center Drive, Suite 310
Hadley, MA 01035-9589
Project Manager:
Danilo Kovilic
Description:
Project consisted of the complete rehabilitation of the historic Duvall Bridge within the Patuxent Research Refuge in Laurel, Maryland. Specific work tasks included the replacement of elastomeric bearings and structural steel members, the application of a high-performance, anti-corrosion bridge coating and the removal and replacement of treated wood decking.
Associated Trades:
Carpentry, Concrete, Painting and Steel
Contract Amount:
$493,530.00
Completion Time:
3 Months (Completed December 2013)
Owner:
U.S. Fish and Wildlife Service
300 Westgate Center Drive, Suite 310
Hadley, MA 01035-9589
Project Manager:
Danilo Kovilic
Pictured Above: Pre-Construction and Post-Construction Photographs of Duvall Bridge (KCC Job #414)
State:
Illinois Department of Transportation - Contract No. 64J92, Item #62; June 2014 Letting (KCC Job #447)*
Description:
Project consisted of substructure repairs and expansion joint replacement on the two structures carrying Avenue "G" over the Rock River in Sterling, Illinois.
Associated Trades:
Concrete, Steel and Traffic Control and Protection
Contract Amount:
$427,205.00
Completion Time:
2 Months (Completed June 2015)
Owner:
Illinois Department of Transportation
2300 South Dirksen Parkway
Springfield, IL 62764
Project Manager:
Wayne Gardner
*IDOT / AGC 2015 Excellence in Construction Award Recipient (Category: Small Construction Project)
Description:
Project consisted of substructure repairs and expansion joint replacement on the two structures carrying Avenue "G" over the Rock River in Sterling, Illinois.
Associated Trades:
Concrete, Steel and Traffic Control and Protection
Contract Amount:
$427,205.00
Completion Time:
2 Months (Completed June 2015)
Owner:
Illinois Department of Transportation
2300 South Dirksen Parkway
Springfield, IL 62764
Project Manager:
Wayne Gardner
*IDOT / AGC 2015 Excellence in Construction Award Recipient (Category: Small Construction Project)
Illinois Department of Transportation - Contract No. 60M84, Item #68; September 2011 Letting (KCC Job #392)
Description:
Project consisted of various bridge repairs to the structure carrying IL Route 1 (Halsted Street) over the Little Calumet River in Chicago, Illinois. Specifically, these repairs involved the removal and replacement of parapet railings, bridge washing and protective coating applications, structural steel repairs to the underside of the bridge including the replacement of several gusset plates and bolts, structural concrete repairs to existing abutments, epoxy-crack injections, the removal and replacement of several rubber fender absorbers along the south abutment wall and traffic control and protection measures, as required.
Associated Trades:
Concrete, Epoxy Injections, Painting, Steel and Traffic Control and Protection
Contract Amount:
$313,440.00
Completion Time:
1 Month (Completed November 2011)
Owner:
Illinois Department of Transportation
2300 South Dirksen Parkway
Springfield, IL
Project Manager:
Danilo Kovilic
Description:
Project consisted of various bridge repairs to the structure carrying IL Route 1 (Halsted Street) over the Little Calumet River in Chicago, Illinois. Specifically, these repairs involved the removal and replacement of parapet railings, bridge washing and protective coating applications, structural steel repairs to the underside of the bridge including the replacement of several gusset plates and bolts, structural concrete repairs to existing abutments, epoxy-crack injections, the removal and replacement of several rubber fender absorbers along the south abutment wall and traffic control and protection measures, as required.
Associated Trades:
Concrete, Epoxy Injections, Painting, Steel and Traffic Control and Protection
Contract Amount:
$313,440.00
Completion Time:
1 Month (Completed November 2011)
Owner:
Illinois Department of Transportation
2300 South Dirksen Parkway
Springfield, IL
Project Manager:
Danilo Kovilic
Pictured Above: Laborers Removing an Existing Gusset Plate and Preparing New Plates; IDOT Contract No. 60M84 (KCC Job #392)
Illinois Department of Transportation - Contract No. 78220, Item #87; September 2010 Letting (KCC Job #380)*
Description:
Project consisted of structural steel repairs and other miscellaneous items of work on the bridge carrying I-57 (Northbound and Southbound) over the Mississippi River in Alexander County, Illinois. Specifically, the work included in this contract consisted of the replacement of a cracked truss member. Prior to replacing the member, several strong-back beams were installed to support the floor beam directly below the cracked truss member. Traffic was reduced to one lane during these operations. Once the strong-back beams were loaded, the truss member was replaced approximately 120' above the roadway deck.
Associated Trades:
Steel and Traffic Control and Protection
Contract Amount:
$456,400.00
Completion Time:
1 Month (Completed October 2011)
Owner:
Illinois Department of Transportation
2300 South Dirksen Parkway
Springfield, IL 62764
Project Manager:
Wayne Gardner
*IDOT / AGC 2011 Excellence in Construction Award Recipient (Category: Small Construction Project)
Description:
Project consisted of structural steel repairs and other miscellaneous items of work on the bridge carrying I-57 (Northbound and Southbound) over the Mississippi River in Alexander County, Illinois. Specifically, the work included in this contract consisted of the replacement of a cracked truss member. Prior to replacing the member, several strong-back beams were installed to support the floor beam directly below the cracked truss member. Traffic was reduced to one lane during these operations. Once the strong-back beams were loaded, the truss member was replaced approximately 120' above the roadway deck.
Associated Trades:
Steel and Traffic Control and Protection
Contract Amount:
$456,400.00
Completion Time:
1 Month (Completed October 2011)
Owner:
Illinois Department of Transportation
2300 South Dirksen Parkway
Springfield, IL 62764
Project Manager:
Wayne Gardner
*IDOT / AGC 2011 Excellence in Construction Award Recipient (Category: Small Construction Project)
Pictured Above: Replacement of Cracked Truss Member, IDOT Contract No. 78220 (KCC Job #380)
Municipal:
Village of Glenview, IL - Downtown River Walk Improvements (KCC Job #449)
Description:
Project consisted of the new construction of a river walk pathway north of Glenview Road, behind 1020 Waukegan Road (Heinen's Foods). Appurtenant scopes of work included concrete sidewalk installations, new stairs and handrails, segmental concrete block retaining walls, streambank stabilization, in-stream structures, landscaping, restoration and miscellaneous items.
Associated Trades:
Clearing and Grubbing, Concrete, Earthwork / Excavation, Landscaping, Restoration, Riprap Installations, Steel and Tree Removals
Contract Amount:
$471,945.00
Completion Time:
9 Months (Completed August 2015)
Owner:
The Village of Glenview
1225 Waukegan Road
Glenview, IL 60025
Project Manager:
Danilo Kovilic
Description:
Project consisted of the new construction of a river walk pathway north of Glenview Road, behind 1020 Waukegan Road (Heinen's Foods). Appurtenant scopes of work included concrete sidewalk installations, new stairs and handrails, segmental concrete block retaining walls, streambank stabilization, in-stream structures, landscaping, restoration and miscellaneous items.
Associated Trades:
Clearing and Grubbing, Concrete, Earthwork / Excavation, Landscaping, Restoration, Riprap Installations, Steel and Tree Removals
Contract Amount:
$471,945.00
Completion Time:
9 Months (Completed August 2015)
Owner:
The Village of Glenview
1225 Waukegan Road
Glenview, IL 60025
Project Manager:
Danilo Kovilic
Pictured Above: Various Phases, Downtown River Walk Improvements Project; Glenview IL (KCC Job #445)
Forest Preserve District of Lake County - North Mill Creek Channel Restoration Project (KCC Job #444)
Description:
Project consisted of modifications to an existing dam at Rasmussen Lake in order to restore the North Mill Creek in Lake County, Illinois. Modifications included the construction of a sheet pile cofferdam stoplog structure on the upstream side of the dam and the installation of a 6'-wide x 3'-high reinforced concrete box culvert ("RCBC") through the dam embankment. Following installation of the RCBC and backfilling of the dam with cohesive material, the drawdown of the lake commenced. The function of the stoplog structure was to slowly lower the level of the lake to allow a natural channel to form in the existing lake bed. Stoplogs were removed from the sheet pile cofferdam structure to faciltate the drawdown of the lake and exposure and consolidation of the lake bottom sediments over time. Exposed sediments were stabilized with native vegetation.
Associated Trades:
Box Culvert Installations, Cofferdam Installations, Concrete, Dewatering, Earthwork / Excavation, Landscaping, Native Plantings, Riprap Installations, Sheet Pile Installations and Site Restoration
Contract Amount:
$1,215,370.00
Completion Time:
6 Months (Completed December 2014)
Owner:
Forest Preserve District of Lake County
1899 West Winchester Road
Libertyville, IL 60048
Project Manager:
Robert Pavlovic
Pictured Above: Various Phases, North Mill Creek Channel Restoration Cofferdam Installation; Lake County Forest Preserve District (KCC Job #444)
Village of Oak Park, IL - Selected Repairs at the Oak Park Public Works Facility (KCC Jobs #417 and #440)
Description:
Projects consisted of the installation of new bolted-on steel weldments under double tee-stems, strenghtening of one cast-in-place beam, replacement of the de-bonded and unsound concrete topping on the first floor, placement of a sealant in tooled joints and routed cracks and the installation of vehicular traffic coating at select locations. This work was quoted as a single bid package; however, due to funding constraints the project was broken up into two separate contracts spanning two years.
Associated Trades:
Concrete, Joint Sealing, Steel, Traffic Control and Project and Waterproofing Operations
Contract Amount:
$324,620.00 and $175,000.00
Completion Time:
3 Months (Completed June 2013) and 3 Months (Completed October 2014)
Owner:
The Village of Oak Park
Department of Public Works
201 South Boulevard
Oak Park, IL 60302
Project Manager:
Danilo Kovilic (KCC Job #417) and Robert Pavlovic (KCC Job #440)
Description:
Projects consisted of the installation of new bolted-on steel weldments under double tee-stems, strenghtening of one cast-in-place beam, replacement of the de-bonded and unsound concrete topping on the first floor, placement of a sealant in tooled joints and routed cracks and the installation of vehicular traffic coating at select locations. This work was quoted as a single bid package; however, due to funding constraints the project was broken up into two separate contracts spanning two years.
Associated Trades:
Concrete, Joint Sealing, Steel, Traffic Control and Project and Waterproofing Operations
Contract Amount:
$324,620.00 and $175,000.00
Completion Time:
3 Months (Completed June 2013) and 3 Months (Completed October 2014)
Owner:
The Village of Oak Park
Department of Public Works
201 South Boulevard
Oak Park, IL 60302
Project Manager:
Danilo Kovilic (KCC Job #417) and Robert Pavlovic (KCC Job #440)
Private:
Zilber Property Group / TI Investors Milwaukee Parking, LLC - Boston Store Parking Garage Repairs (KCC Job #409)
Description:
Project consisted of miscellaneous repairs to an existing six-story parking garage in the City of Milwaukee, Wisconsin. Appurtenant scopes of work included top-of-slab concrete repairs, underside concrete repairs, concrete wall repairs, concrete repairs below expansion joints, miscellaneous concrete repairs at stairs and rust stain areas, the replacement of damaged concrete curbing on existing ramps, concrete repairs to columns, epoxy crack injections, concrete beam repairs, temporary shoring (as needed), the removal of loose paint from underside of concrete deck, site electrical, drainage improvements, the installation of a waterproofing membrane, painting operations, elevator improvements and general cleanup.
Associated Trades:
Concrete, Electrical, Epoxy Crack Injections, Painting, Plumbing, Traffic Control and Protection and Waterproofing Operations
Contract Amount:
$1,833,218.76
Completion Time:
2 Years (Completed March 2014; this project was implemented in three intermittent phases as funding became available. The first phase commenced in June 2012, the second phase in April 2013 and the final phase in August 2013)
Owner:
Zilber Property Group
710 North Plankinton Avenue, Suite 1100
Milwaukee, WI 53203
Project Manager:
Danilo Kovilic
Description:
Project consisted of miscellaneous repairs to an existing six-story parking garage in the City of Milwaukee, Wisconsin. Appurtenant scopes of work included top-of-slab concrete repairs, underside concrete repairs, concrete wall repairs, concrete repairs below expansion joints, miscellaneous concrete repairs at stairs and rust stain areas, the replacement of damaged concrete curbing on existing ramps, concrete repairs to columns, epoxy crack injections, concrete beam repairs, temporary shoring (as needed), the removal of loose paint from underside of concrete deck, site electrical, drainage improvements, the installation of a waterproofing membrane, painting operations, elevator improvements and general cleanup.
Associated Trades:
Concrete, Electrical, Epoxy Crack Injections, Painting, Plumbing, Traffic Control and Protection and Waterproofing Operations
Contract Amount:
$1,833,218.76
Completion Time:
2 Years (Completed March 2014; this project was implemented in three intermittent phases as funding became available. The first phase commenced in June 2012, the second phase in April 2013 and the final phase in August 2013)
Owner:
Zilber Property Group
710 North Plankinton Avenue, Suite 1100
Milwaukee, WI 53203
Project Manager:
Danilo Kovilic
Northwestern University - Entrance Drive Rebuilding at Rebecca Crown Memorial Center (KCC Job #378)
Description:
Project consisted of the removal and replacement of the concrete slab-on-grade at the entrance drive, down ramp to building and loading dock / parking garage entrance of the Rebecca Crown Memorial Center; the rebuilding of several trench drains along with the replacement of trench grates; the removal and replacement of an asphalt parking lot and the removal and replacement of concrete sidewalk, driveway, apron and curbs.
Associated Trades:
Asphalt Paving, Concrete, Demolition, Removals, Restoration, Striping and Traffic Control and Protection
Contract Amount:
$125,206.49
Completion Time:
3 Months (Completed October 2011; this project was implemented in three intermittent phases at the instruction of the Owner. The first phase was implemented in November 2010; the second phase was implemented in August 2011 and the third phase was implemented in September 2011)
Owner:
Northwestern University
2020 Ridge Avenue
Evanston, IL 60201
Project Manager:
Danilo Kovilic
Description:
Project consisted of the removal and replacement of the concrete slab-on-grade at the entrance drive, down ramp to building and loading dock / parking garage entrance of the Rebecca Crown Memorial Center; the rebuilding of several trench drains along with the replacement of trench grates; the removal and replacement of an asphalt parking lot and the removal and replacement of concrete sidewalk, driveway, apron and curbs.
Associated Trades:
Asphalt Paving, Concrete, Demolition, Removals, Restoration, Striping and Traffic Control and Protection
Contract Amount:
$125,206.49
Completion Time:
3 Months (Completed October 2011; this project was implemented in three intermittent phases at the instruction of the Owner. The first phase was implemented in November 2010; the second phase was implemented in August 2011 and the third phase was implemented in September 2011)
Owner:
Northwestern University
2020 Ridge Avenue
Evanston, IL 60201
Project Manager:
Danilo Kovilic
Pictured Above: Various Phases, Entrance Drive Rebuilding at Rebecca Crown Memorial Center; Northwestern University (KCC Job #378)
Solomon Schechter Day School - Plaza and Parking Garage Repairs (KCC Job #386)
Description:
Project consisted of full and partial depth concrete repairs, the removal and replacement of concrete topping slabs, the replacement of several concrete planks, the installation of several steel beams and columns for structural support in the existing parking garage, epoxy-crack injections, sealant and waterproofing applications and the re-pointing of deteriorated mortar joints.
Associated Trades:
Caulking, Concrete, Epoxy Injections, Tuck Pointing, Steel and Waterproofing Membrane Applications
Contract Amount:
$368,328.00
Completion Time:
4 Months (Completed October 2011)
Owner:
Solomon Schechter Day School
3210 Dundee Road
Northbook, IL 60062
Project Manager:
Danilo Kovilic
Description:
Project consisted of full and partial depth concrete repairs, the removal and replacement of concrete topping slabs, the replacement of several concrete planks, the installation of several steel beams and columns for structural support in the existing parking garage, epoxy-crack injections, sealant and waterproofing applications and the re-pointing of deteriorated mortar joints.
Associated Trades:
Caulking, Concrete, Epoxy Injections, Tuck Pointing, Steel and Waterproofing Membrane Applications
Contract Amount:
$368,328.00
Completion Time:
4 Months (Completed October 2011)
Owner:
Solomon Schechter Day School
3210 Dundee Road
Northbook, IL 60062
Project Manager:
Danilo Kovilic
Pictured Above: Various Phases, Solomon Schechter Day School Plaza Waterproofing and Concrete Topping Slab Replacement (KCC Job #386)
Additional project references and contacts shall be made available upon request. Please contact Danilo Kovilic, Management Representative, at (847) 671-4978 (ext. 4) for all such requests.